The Challenge
Project requirement
The 40 ft GRP boat package needed complete production-ready drawings across arrangement, structure, machinery, steering, hull, and electrical systems.
Our Solution
How Sea Keepers delivered
Sea Keepers consolidated the BBBY manufacturing material into a clear portfolio case with a Drive-derived GA drawing preview and hidden private title-block details.
Scope
What was involved
- Engineering design and technical documentation
- Material specification and construction coordination
- Quality control, testing, and delivery support
Get a Quote 